parallel processing test
A recovery test that brings the backup site up and feeds it the same work as production, so the results can be compared.
In more detail
Production keeps running normally while the recovery site processes the same transactions alongside it. Comparing the two outputs shows whether the recovery site really works, without the risk of moving live users. It gives more confidence than a tabletop or simulation, but less than a full failover, which is the only test of the real switch-over.
Related terms
- tabletop exercise — A practice session where the response team talks through a realistic incident scenario step by step, to test the plan without touching systems.
- simulation — A practice exercise that walks through a realistic event step by step, without harming real systems or people.
- failover — Switching work from a failed or unavailable system to a standby copy so the service keeps running.
- recovery site — An alternative location where an organisation can run its critical systems and carry on working if its main site becomes unusable.