dev/prod parity

Keeping development, staging and production as similar as possible in timing, people and tools.

In more detail

Factor X of the twelve-factor app names three gaps: the time gap between writing and running a change, which should be hours; the personnel gap between authors and operators, which should be zero; and the tools gap between backing services, which engineers create themselves with a lightweight local database. The bugs that survive testing are the environment-specific ones.

Related terms

Taught in

References