design effectiveness

Whether a control, as written, would actually prevent or detect the problem it is meant to address if it were followed.

In more detail

Auditors test design first, often by reading the policy and walking through one example. A policy that requires approval but lets engineers approve their own changes fails on design before a single ticket is examined. A SOC 2 Type 1 report covers design at a single point in time.

Related terms

Taught in

References