deployment frequency
The number of deployments to production over a period, or equivalently the time between deployments.
In more detail
It is a count over a window you choose. It is easy to game, for example by splitting one deploy into three, which is why DORA metrics must not become targets.
Example
deployment frequency 6.2 per weekRelated terms
- DORA metrics — Five measures of software delivery from the DORA research: change lead time, deployment frequency, failed deployment recovery time, change fail rate and deployment rework rate.
- deployment log — A file the deploy job appends one line to per deployment, holding the time, the commit and the result.
- change lead time — The time from a commit being made to that commit running in production.
- batch size — How much change is shipped together in one deployment or release.
Taught in
- DORA Metrics: Measuring Your Pipeline — Continuous Integration & Continuous Delivery Pipelines
- Feature Flags and DORA Metrics — Continuous Integration & Continuous Delivery Pipelines
- What DevOps Actually Is — DevOps & Site Reliability Engineering
- Throughput: Change Lead Time And Deployment Frequency — DevOps & Site Reliability Engineering
- The Four Keys History And Retiring MTTR — DevOps & Site Reliability Engineering
- The Pitfalls Of Measurement — DevOps & Site Reliability Engineering